C-711 Lay-in- Pipe Hanger (J-Hanger)
Saves installation time by allowing the conduit or pipe to be laid in place after the hanger is mounted.
Fastening of side bolt can be delayed until most convenient for job conditions. Insulation can be installed without removing pipe from hanger. The C-149 hanger can be suspended from hanger rod or can be bolted directly to a wall. When used with hanger rod, assembly requires two H-114 hex nuts.
Vertical adjustment of at least 1½ inches after pipe is laid in place. The lower nut adjusts pipe lines to the proper pitch and the top nut when locked into position prevents loosening due to vibration. The square nut on the side bolt is kept from loosening by the arrangement of hole and up-turned lip.